Grid site upgrade
Short video of the December 2007 upgrade of the AEGIS01-PHY-SCL Grid site at the Scientific Computing Laboratory of the Institute of Physics Belgrade. With a speed of 4.4 Tflops and 25 TB storage capacity it is the premiere production grid facility in South East Europe (YouTube April 18, 2008).
(Video created by Branimir Ackovic)